Hello! Log in or Register   |  Help  |  Donate  |  Buy Shirts See all banner ads | Advertise on TheSamba.com  
TheSamba.com
 
Turbine Time - 2
Photo link: Forum code:
Turbine Time - 2
Author Photo
Exaktaphile
Samba Member


Joined: October 01, 2010
Photos: 241

Exaktaphile is offline 

Turbine Time - 2 Posted: Tue Jul 24, 2018 12:42 pm     Views: 26      Rating: Not rated

The wooden box will be nearly a 10 inch cube. Parts used in these pics:

3 - 1/4 x 5" bolts with washers/nuts. Snug them up until the gasket seats well but don't overtighten and collapse the turbine housing.
3 - 3.5" pieces of 3/16" PVC for spacers. Adjust length according to your motor/gasket thickness.
1 - piece of an old electrostatic computer mat for the gasket between wood and fan. Anything will work but be sure the fan doesn't suck air from inside the box.
1 - 1 1/4" PVC coupler for air intake, epoxied into a 2" bore in the wood. The I.D. of this size coupler is a little bigger than the fan intake.

hvlp turbine

Search Forums for photo
View user's profile Send private message Gallery Classifieds Share: Facebook Twitter
All times are Mountain Standard Time/Pacific Daylight Savings Time

About | Help! | Advertise | Donate | Premium Membership | Privacy/Terms of Use | Contact Us | Site Map
Copyright © 1996-2023, Everett Barnes. All Rights Reserved.
Not affiliated with or sponsored by Volkswagen of America | Forum powered by phpBB
Links to eBay or other vendor sites may be affiliate links where the site receives compensation.