Hello! Log in or Register   |  Help  |  Donate  |  Buy Shirts See all banner ads | Advertise on TheSamba.com  
TheSamba.com
 
36 Hosre rebuild steps
Photo link: Forum code:
36 Hosre rebuild steps
Author Photo
outoftheoffice
Samba Member


Joined: March 02, 2009
Photos: 302
Location: Houston, Texas
outoftheoffice is offline 

36 Hosre rebuild steps Posted: Mon Feb 28, 2011 6:38 am     Views: 224      Rating: Not rated

Installed the oil pressure sensor, coil, j-tubes with half heater boxes, clutch, pressure plate, oil filler neck, thermostat air control ring, and muffler

Search Forums for photo
View user's profile Send private message Gallery Classifieds Share: Facebook Twitter
All times are Mountain Standard Time/Pacific Daylight Savings Time

About | Help! | Advertise | Donate | Premium Membership | Privacy/Terms of Use | Contact Us | Site Map
Copyright © 1996-2023, Everett Barnes. All Rights Reserved.
Not affiliated with or sponsored by Volkswagen of America | Forum powered by phpBB
Links to eBay or other vendor sites may be affiliate links where the site receives compensation.